Monday, 6 June 2011

Stage 2 Photos

Here are some images from our final day of building and testing.


All the materials in our window are reused - plastic packaging for glazing, aluminium railing for the frame and tip shop sources chipboard for the reveal:


We also used the plastic packaging for flashing:


Fitting the window and wrapping the sarking over the flashing:


We reused old pallets from the Enviro Shop for most of the timber in our wall. Here we are finishing off the cladding:


The timber for the roof truss was found at the Outlook Shop at Reservoir tip:


The wall is insulated between the studs. We used an old pillow:


Glenn found an old section of steel angle to use as a lintel over our window for the bricks:


Here's our finished wall! The roofing is from the tip shop, and we had a great time using the angle grinder to cut the sheet in half.


There are a few more images from our day of construction in our Twitter feed in the side bar. Stand by for some more images and the video of out final test.

No comments:

Post a Comment